http://www.hamuniverse.com/3el2meterquad.html
So heading out to the shed the first thing is the spreaders supports on the main beam.

Spreader setup. The ends are tee's cut down and a notched so the wire loop is held.

Drive element secured to beam and feed line temp installed.

Lots of minor steps later.......

Don't Know if It will get used this year,hoping to get a connector and switch before the snow stays.
The reason I call it a Lincoln Log Quad is to me it sort of looks like I built it with Lincoln logs

